Wednesday, December 4, 2013

(4) Year-Long Afghan

As I mentioned before, I was working on finishing this afghan that I started at the beginning of 2010. Last night I finished piecing together the last of the blocks and also crocheted a border around the edges. The end result is a very wonky blanket. Not all blocks were the same size (stupid gauge!), so that affected the shape of the afghan. But I remember working on each square and the skills/techniques that I learned. And that is the important thing.

I didn't place the squares in the order that they were knit, but I'll describe them in the order of the finished blanket from the top left corner going across.

The top left square is a fair isle pattern for October. By this point, I was running out of the grey color and I didn't want to buy more, so that is why the center part of the pattern used black instead of grey.

Next is the January square, which created a pattern using knits and purls. I remember that this one came out smaller than it was supposed to and I tried to aggressively block it, which stretched it out too much. So the blocking/size issues occurred from the very beginning.

Finishing out the top row is the February square, which taught us about mosaic knitting, a technique that I think it really neat but which I haven't yet used again. I really should try it again.

Starting row two is the December square, which was just garter stitch stripes to use up whatever yarn we had leftover. I actually had only half finished this one so I did finish it up this past week. It's a pretty massive square.

Next to it is the May square with a cable pattern. I like cables. They're not really that difficult but they look really neat.

And at the end of row two is the March square which was another cable square. That's something I like about cables. There are so many different ways of doing them that patterns can look completely different even when using a similar technique.

Row three starts with the November square, which was all about texture with brambles, basketweave, and bobbles. I thought the bobbles were fun to knit. But this square is absolutely massive, the biggest one of the bunch. No wonder I ran out of the grey yarn! I really should have ripped this out and gone down a needle size (or two) when I saw how big it was turning out, but I was convinced that blocking would solve everything. Ha ha!

Then comes the September square. This one was really neat because you start out in the center and knit out. It creates a really interesting pattern. I think I'd like to make more things like this. I need to keep that in mind!

Row three ends with the June square, which used the linen stitch. I'll have to admit that I'm not crazy about how this square turned out. I'm not sure if I should have left the grey out (definitely not as the main color at least) or if I'm just not a fan of linen stitch. Guess I should try it again some time to figure that out.

The last row starts with the August mitered squares block. This was a really awesome technique and I told myself that I wanted to do a whole blanket with blocks like this. Well, that was a few years ago--have I done that? Nope. Guess it's another thing to put on my knitting to do list.

Then comes the other fair isle square, for April. This one was knit in the round and then in October, we had a special class for steeking! For those of you not up to knitting lingo, steeking means that you cut your knitting (in this case to make a tube into a flat square). We reinforced the sides with a sewing machine, and then cut away. Picking up stitches around the edge to create a border helped to also reinforce those stitches. It was my first (and still only) time with steeking, and it was quite exhilarating! I definitely have to do that again. This square also has the year--2010--so I'll always remember when I started it (and completed most of it--and how long I waited before putting the blocks together).

The last block is the lace block, which was July. This one was the smallest block. Once again, I should have ripped this out and started again on larger needles as well as adding more to it. But I told myself that lace can block out much larger. Sure...that obviously didn't happen!

Anyway, I'm happy to have it done and it will always be a reminder of learning lots of lessons, including lessons about finishing and gauge. I love it for that!


Monday, December 2, 2013

Catching up on a hibernating project

For Thanksgiving, my in-laws came to visit and they were here from Wednesday through Monday (just this morning). I was happy to have them here, but it meant that I couldn't work on my MIL's Christmas present during that time (a shawl), so I had to find other projects to work on. After doing a doll cardigan and skirt for my nieces, I decided to pull out a project that has been sitting in my closet for a long time.

It's an afghan with 12 different blocks. During 2010, I took a class at my LYS during which we did one block per month throughout the entire year, learning new techniques with each block. I actually completed all of the blocks not too long as 2010, but I had not put them together. It seems like finishing is always the bane of my knitting existence. It's not like it was all that tedious--just picking up stitches and doing a three-needle bind off, but I kept putting it off. I decided to pull that out of the closet and finish it up now, before the end of the year, so that it would only be a project that took four years rather than drifting off into a fifth year!

I realized that the final block wasn't completely finished (it was a simple garter stitch stripe block meant to use up leftovers), so I completed that and started piecing the blocks together. As of right now, I have finished joining all four sets of three blocks and am just about halfway through joining two of those sets of three together. It is slow and tedious, but it is getting done, which is the important thing. Now I just have to keep at it. I'll post pictures when it is done.

And I got a bit of a reprieve in knitting time for my MIL's present as we won't see them until the Saturday after Christmas, so that gives me a couple of extra days beyond Christmas (also means I don't have to finish early to leave time to mail it!). So perhaps I can finish the Christmas knitting as well as the afghan by the end of the year.

Of course I got slammed with editing projects today which means taking more time away from my crafting. I also want to set up our Christmas tree and do some other Christmas decorations. I guess that means I should stop writing and get back to editing! I'll make sure the next few posts have a lot of pictures to make up for the lack in this one.